South Windsor Milling and Resurfacing Project

June 6, 2016

The Connecticut Department of Transportation has announced that a milling and resurfacing project will be performed on Route 30 and Route 194 in South Windsor, today, Monday, June 6 through Friday, June 24.

The project consists of milling and resurfacing a 1.66 mile segment of Route 30 and a 0.61 mile segment of Route 194 in South Windsor. This project is included in the Department of Transportation's 2016 Vendor Resurfacing Program

LANE CLOSURE INFO

Motorists can expect lane closures on Route 30 from Route 194 (Sullivan Avenue) to the Manchester town line and Route 194 from Route 30 to Route 74 (Ellington Road) in South Windsor.

The regular work schedule for the milling and resurfacing is 7:00 a.m. to 3:00 p.m.  (Monday - Friday)

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.