Skip to main content

Plans to Upgrade Exit 30D on Route 8

The Connecticut Department of Transportation (CTDOT) is moving forward with a plan to improve safety and traffic in Waterbury on Route 8 and West Main Street. Here’s what it will look like:

πŸš— A new Exit 30D off-ramp:
CTDOT will move the Route 8 Southbound Exit 30D ramp to a new location at Watertown Avenue, directly across from Robbins Street (about 750 feet north of West Main Street). This change will create a safer, more straightforward connection for drivers entering the neighborhood.

↔️ Two-way traffic on Watertown Avenue:
Watertown Avenue will shift from one-way traffic to a two-way street, making it easier to navigate and improving local access.

πŸ›£οΈ Bridge removal:
CTDOT will remove the two existing bridges that currently carry Route 8 and the Exit 30D ramp over Watertown Avenue as part of the redesign.

🚦 Improvements on West Main Street:
The project will also upgrade West Main Street and add a new traffic signal at Highland Avenue to improve safety and reduce congestion.

CTDOT expects to complete the design in spring 2029 and begin construction in the fall later that year.
 
Please feel free to contact me by email at larry.butler@cga.ct.gov. 

β€Ή Back to All Articles