Skip to main content

Heating Assistance, Medicare Open Enrollment, and more

Click HERE to follow me on Facebook!

I wanted to share an update regarding Southington’s Fire Department and the federal SAFER grant. I worked closely with Fire Chief Lee and our federal delegation to support the grant application, which was approved at the federal level and would have provided funding for additional firefighters.

Unfortunately, at the last Town Council meeting, the Council voted not to accept the SAFER grant at this time. I remain hopeful that a more positive resolution can be reached.

I will continue working with local and federal officials to advocate for the staffing and resources our fire department needs. Our firefighters deserve the support necessary to do their jobs safely and protect our community, and I will continue standing with them.

In this week’s eblast, you can read about home heating assistance, Medicare open enrollment, and more. You can click the links below to navigate between sections.

 
Early Voting Starts Monday

Starting Monday, October 19, you can vote early in person.

Early voting will be available from October 19 through November 1, including weekends.

Early Voting Locations:

  • Southington: Southington Public Library, 255 Main Street
  • Farmington: Town Hall, 20 Monteith Drive
  • Plainville: Municipal Center, 1 Central Square

Early Voting Hours:

October 19 – November 1: 10:00 AM – 6:00 PM daily

Extended Hours: Tuesday, October 27 and Thursday, October 29, from 8:00 AM – 8:00 PM

Whether you vote early or on Election Day, make sure you have a plan to cast your ballot!

Election Day is Tuesday, November 3! Election day voting will take place at your regular voting location.

 
Home Heating Assistance

$12.7 million is being allocated from Connecticut’s Federal Cuts Response Fund to supplement home heating assistance for eligible households during the 2026–27 winter season.
 

With heating costs on the rise, this funding will provide meaningful relief for low-income households struggling to make ends meet and help ensure that Connecticut residents can keep their homes warm during the cold winter months.
 

The Connecticut Energy Assistance Program, administered by the Department of Social Services in partnership with the state’s nine community action agencies, is expected to help more than 94,000 households this season, including nearly 33,000 that rely on deliverable heating fuel. This additional funding will allow eligible households to access their benefits at the same time, helping them fill their tanks before prices climb even higher.

 

Who qualifies?

Households with annual gross incomes at or below 60% of the state median income may qualify. For a family of four, that means an annual income of $93,681 or less for the 2026–27 heating season. Some households receiving benefits such as SNAP, Temporary Family Assistance, or Supplemental Security Income may also qualify. The program prioritizes older adults, families with children under age six, and people with disabilities.

 

Applications are now open.

  • First day for program-paid fuel deliveries: Nov. 2
  • Application deadline: May 31, 2027
  • Please note: You must apply each year to receive assistance.

 

How to apply

 

This is the sixth proposed use of Connecticut’s Federal Cuts Response Fund, which the governor and General Assembly established in 2025 to help Connecticut respond to significant federal policy and funding changes. Approximately $250.6 million will remain available in the fund following this proposal.

 

If you or someone you know needs help paying for heat this winter, please spread the word. Applying early can help eligible households access assistance before the coldest months arrive. Residents who need help finding their local community action agency can also call 2-1-1.

 
Cybersecurity Awareness Month
October is Cybersecurity Awareness Month, a time to remind ourselves that staying safe online starts with a few simple habits. As technology and artificial intelligence continue to evolve, scammers are finding new ways to make phishing emails, texts, and other scams look convincing.

Take a moment to stop, think, and verify before clicking a link, opening an attachment, or sharing personal information. Be cautious of unexpected messages, unfamiliar senders, urgent requests, and anything that seems unusual.

SEE SOMETHING? SAY SOMETHING. If something feels unusual or suspicious, report it, even if you have already clicked. Fast reporting is one of the most effective ways to limit potential damage, and you will never be in trouble for reporting something in good faith.
 
Medicare Open Enrollment
Now is the time to plan for your Medicare coverage for the year ahead. Medicare Open Enrollment runs from October 15 through December 7, giving those who qualify an opportunity to review or change their health and prescription drug coverage for 2027.

Before Open Enrollment beings, take some time to compare your current coverage with your options for next year. You can review plans based on your specific prescriptions, doctors, providers, pharmacies, premiums, and out-of-pocket costs to find coverage that meets your needs and budget. CLICK HERE to compare Medicare plans.

You can also log in or create your Medicare account to review your coverage and explore your options. 
 
2027 Legislative Internship Program Accepting Applications!

Applications for the 2027 Legislative Internship Program at the Connecticut General Assembly are open until November 1! 

 

The program offers Connecticut undergraduate college students a part-time role in legislative offices, with academic credit, direct access to lawmakers, and exposure to the state’s policy-making process.

 

Interns are assigned to work with a legislator and/or legislative aide in the House Democratic Offices, Senate Democratic Offices, House Republican Offices, or Senate Republican Offices of the Connecticut General Assembly. Duties vary, but the most common are:

  • Track proposed bills through the legislative process
  • Research the history and context of legislative issues or questions
  • Research constituent questions and requests
  • Outreach to other state agencies
  • Draft testimony with the possibility of presenting in front of a committee
  • Communication with constituents, CGA staff, and other legislators
  • Track meeting minutes
  • Assist in Joint Favorable Report writing
  • Attend Legislative Session
  • Attend public hearings and committee hearings
  • Attend press conferences
Interns work two eight-hour days a week (Monday/Wednesday or Tuesday/Thursday) that will align with the legislative session/college spring semester.  

 

Required orientation dates are January 21 and 22, from 88am-5pm.

Click here to learn more about this great opportunity!

 
Community Events
 
Roadwork Corner

Please see below for the “Roadwork Corner” section of the eblast, which will include information on current and upcoming roadwork to stay aware of. Please make sure to check in weekly for the latest updates!

A sitewide paving operation will take place along Route 72 in Plainville and New Britain beginning on or around September 20, 2026 and continuing through early October 2026. The project 0171-0501 consists of rehabilitation measures for four (4) bridges that includes, but are not limited to, deck rehabilitation, superstructure rehabilitation or replacement, and substructure rehabilitation. Other major project elements include paving, roadway drainage, guiderail replacement, highway design and construction, traffic engineering and work zone traffic control, illumination and Incident Management Systems (IMS) replacement or preservation, and utility coordination, as well as related design and construction requirements detailed throughout the Technical and General Provisions including Appendices and referenced authoritative sources.

Traffic will remain open during construction; however, motorists should expect shifted travel lanes, reduced shoulder widths, temporary pavement markings, construction signage, and changing traffic patterns throughout the work zone.

Traffic control devices and signing will be installed to help guide drivers safely through the temporary roadway configuration. Motorists are advised to use caution, reduce speeds, and remain alert for construction vehicles, roadway workers, and temporary lane changes in the area.

Please note that the schedule may be modified or extended due to weather conditions or other unforeseen circumstances.

 

A pavement marking project will be performed on State Routes in Enfield, Somers, West Hartford, Bloomfield, Vernon, Union, Bolton, Coventry, Andover, Plainville, Bristol, Meriden, Cromwell, Glastonbury, Wolcott, Cromwell, New Britain, Southington and Rocky Hill starting on Sunday August 30, 2026.


The project consists of pavement marking grooves, centerline rumble strips and epoxy pavement marking applications on center lines, shoulder lines and handwork on State Routes in Enfield, Somers, West Hartford, Bloomfield, Vernon, Union, Bolton, Coventry, Andover, Plainville, Bristol, Meriden, Cromwell, Glastonbury, Wolcott, Cromwell, New Britain, Southington and Rocky Hill. This project is scheduled to occur Sunday, August 30 to Friday, November 6, 2026, by Safety Markings Inc.  No work will be performed the day before or day after all State recognized holidays.

This project is being performed by Safety Markings Inc. The locations for this work are listed below:
 

  • Route 190 in Enfield and Somers
  • Route 189 in West Hartford and Bloomfield
  • State Road 527 in Vernon
  • Route 171 in Union
  • Route 6 in Bolton, Coventry and Andover
  • Route 72 in Plainville and Bristol
  • Route 15 in Meriden
  • Route 99 in Cromwell
  • Route 83 in Glastonbury
  • Route 322 in Wolcott
  • Route 372 in Cromwell
  • Route 71 in New Britain and West Hartford
  • Route 229 in Southington
  • I-91 South in Cromwell / Rocky Hill

LANE CLOSURE/DETOUR INFO

Traffic control personnel, sign patterns, cones, and truck mounted attenuators will be utilized to guide motorists through the work zone.  The regular work schedule for this project is 8:00 p.m. to 6:00 a.m. (Sunday – Friday) on secondary and 8:00 p.m. to 5:00 a.m. Expressways.

 

There will be lane shifts on Route 72 in Plainville/New Britain. The project 0171-0501 consists of rehabilitation measures for four (4) bridges that includes, but are not limited to deck rehabilitation, superstructure rehabilitation or replacement and substructure rehabilitation.

Other major project elements include paving, roadway drainage, guiderail replacement, highway design and construction, traffic engineering and work zone traffic control, illumination and Incident Management Systems (IMS) replacement or preservation, and utility coordination, as well as related design and construction requirements detailed throughout the Technical and General Provisions including Appendices and referenced authoritative sources. 


Manafort Brothers Incorporated will implement traffic shifts on various Route 72 structures in Plainville/New Britain beginning on or around June 15 and continuing through early December 2026. Traffic will remain open during construction. Motorists should expect shifted travel lanes, reduced shoulder widths, temporary pavement markings, construction signage, and changing traffic patterns throughout the work zone.

Traffic control devices and signing will be installed to help guide drivers safely through the temporary roadway configuration. Motorists are advised to use caution, reduce speeds, and remain alert for construction vehicles, roadway workers, and temporary lane changes in the area.
 

Please note that the schedule may be modified or extended due to weather conditions or other unforeseen circumstances. Additional traffic shifts will occur as needed in the project area into December 2026.

 

The Connecticut Department of Transportation (CTDOT) is announcing that a Joint and Crack Sealing project will be performed on various state routes within the Greater Hartford region (CTDOT District 1). This project is scheduled to occur on Monday, June 1, 2026, and be completed on Friday, November 6, 2026. Project DOT01703229CN consists of pavement joint and crack sealing.

LANE CLOSURE/DETOUR INFO

There will be various lane closures on various state routes (see list below) from Monday, June 1, 2026, to Friday November 6, 2026, from 7:00 a.m. to 4:00 p.m. Traffic control personnel and signing patterns will guide motorists through the work zone.

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area. The following routes are included in this project:

Andover:

Route 316 between Route 6 and Hebron town line

Berlin:

Route 71 between Route 372 (Farmington Avenue) and SR 571

Bristol:

Route 72 East of Blakeslee Street to Main Street No. 1

East Windsor:

SR 510 between Route 5 by Wagner Lane and Route 5 by King Street

Route 140 between Route191 to Route 286

Manchester:

Route 83 between US 6 & 44 (Center Street) to Route 30

Mansfield:

Route 32 between Route 275 and Route 44

Route 44 between the Coventry town line and Route 195

Route 320 between Route 195 and Route 320

Plainville:

SR 536 between Route 372 (East Main Street) to White Oak Avenue

Wolcott:

Route 322 between Woodtick Road and SR 844

 

The Connecticut Department of Transportation (CTDOT) is developing plans under State Project No. 0171-0535 to replace existing traffic control signal equipment in Andover, Berlin, East Windsor, Manchester, New Britain, Southington, Vernon, West Hartford, Wethersfield, Willington, and Wolcott.

The project involves the full replacement of the traffic signal equipment at seventeen intersections. At applicable locations, pedestrian control features (countdown pedestrian indications, accessible pushbuttons, sidewalk ramps) will be upgraded in an effort to improve accessibility and pedestrian safety. CTDOT will coordinate with the City/Town during the design phase. The following intersections are included:

Traffic Control Signal – Full Replacement Intersections:

  • Andover – U.S. Route 6 (Jonathan Trumbull Hwy./Willimantic R.) at Route 87 (Jonathan Trumbull Hwy.)
  • Berlin  Route 9 NB Ramps at S.R. 572 (Frontage Rd.) and Driveway to Theater
  • East Windsor Route 140 at Route 191 and Melrose Rd.
  • Manchester  Route 502 (Spencer St.) at Shopping Plaza Driveway and Shoprite Shopping Center Driveway
  • New Britain Route 9 NB Ramps at Ellis St
  • New Britain Route 9 NB Off-ramp at Columbus Blvd and Bosco Dr
  • Southington Route 229 (West St.) at Curtis St
  • Vernon S.R. 533 (Tunnel Rd) at 542 (Whitney T Ferguson III Rd) and Keynote Dr
  • West Hartford Route 189 (Bloomfield Ave.) at Route 185 (Simsbury Rd.)
  • Wethersfield Route 287 (Prospect St.) at Goff Rd. and Bittersweet Hill
  • Wethersfield Route 287 (Prospect St.) at Ridge Rd.
  • Wethersfield Route 287 (Prospect St.) at Thornbush Road
  • Wethersfield Route 287 (Prospect St.) at Willow St
  • Wethersfield Route 287 (Prospect St.) at Back Lane and Orchard Brook Dr.
  • Willington Route 74 (Tolland Tpke.) at Old Farms Rd. and Jared Sparks Rd.
  • Wolcott Route 69 (Wolcott Rd.) at Munson Rd. and Sunrise Rd.
  • Wolcott Route 69 (Wolcott Rd.) at Route 322 (Center St.) and Beach Rd.

The present schedule indicates that the design will be completed in May of 2028, with construction anticipated to start in Spring of 2029, assuming acceptance of the project, availability of funding and receipt of any required right-of-way and environmental permits. This project will be undertaken with 20% federal and 80% state funds.

It is CTDOT’s policy to keep the public informed and involved when such projects are undertaken. It is important that the community share its concerns with CTDOT to assist in the project’s development. If anyone has any questions or comments on this project, contact Kaethe Podgorski, Project Manager, at (860) 594-2189 or by e-mail at Kaethe.podgorski@ct.gov. Please make reference to State Project No. 0171-0535.

 
Town Meeting Schedules

You can use the following links for access to town meeting schedules for the three towns in our district:

Plainville Town Meeting Schedule

Farmington Town Meeting Schedule

Southington Town Meeting Schedule

 
‹ Back to All Articles