CTDOT is developing plans to replace the existing wooden noise barrier on I-691 westbound, beginning at the on-ramp from Route 322 (West Main Street) and continuing for approximately 2,250 feet along the I-691 mainline. The guiderail adjacent to the noise barrier will be upgraded under this project.
The replacement noise barrier will be constructed of concrete or other materials that require less maintenance and have a longer design life. The present schedule indicates that the design will be completed in December 2025, with construction anticipated to start in Spring 2026, assuming acceptance of the project, availability of funding, and receipt of any required right-of-way and environmental permits. This project will be undertaken with 100% state funds.
If anyone has any questions or comments on this project, contact Michael Cherpak, Principal Engineer, at (860) 594-3155 or by e-mail at Michael.Cherpak@ct.gov. Please make reference to State Project No. 0131-0210.
|