|
Rehabilitation of the Putnam Memorial Bridge in Glastonbury and Wethersfield will begin on Monday.
The purpose of this project is to increase the load rating factor for all legal, permit, and emergency vehicles through strengthening and bracing of the existing structural steel.
The project will also include deck patching and new wearing surface installation, drainage repairs, inspection catwalk removal, substructure concrete repairs, and full painting of the bridge.
|