|
In addition, the Connecticut Department of Transportation expects to upgrade pedestrian facilities, detection, and controllers at:
- Route 83 at Green Circle Road and Shopping Center Drive
- Route 83 at Dobson Road
- Route 83 at Pitkin Road and a private driveway
- Route 83 at Route 30 and Kelly Road
- Route 83 at I-84 East off-ramp (South Junction)
- Route 83 at I-84 East off-ramp (North Junction)
Construction is expected to begin in the winter of 2026. |